Dominator Project

New Mexico

Fall 2018/Spring 2019 

Project involved the concurrent construction of two seven train facilities with tank batteries, two phase vertical separators, three phase production separators, sales gas scrubber, flare scrubber and flare stack located on two individual pad sites. 

Kaiser-Francis Silo Plant

Wyoming

August 2014 - November 2014

​The Kaiser-Francis Silo Plant is composed of a Cryogenic and Amine Plant, Hot-oil system and compression. 

Community Compressor Station

Oklahoma

February 2017 - August 2017  

​The Community is a grass-roots, four compressor station with header rack, slug catcher, inlet filter, fuel gas scrubber, regen skid and tank farm.   

Black Coyote CDP

Oklahoma

December 2017 - January 2018 

​The Black Coyote CDP (Central Delivery Point)  Crude Oil Gathering project involved installation of header rack with piping, two vertical can pipeline pumps, inlet and outlet leak detection meters, slop tanks with containment and civil work (foundations and supports).

Little Mary Compressor Station

Texas

March 2015 - May 2015

​The Little Mary Compressor Station consist of four compressor units, header rack, inlet area, fuel gas area, regen skid and tank farm. 

Wrangler Compressor Station

Texas

November 2017 - January 2018

The Wrangler Compressor Station is a grassroots project consisting of the initial site grading and stabilization, construction and installation of two compressor packages, header rack with piping, horizontal slug catcher, inlet filter, vent stack, discharge filter, glycol contactor with exchanger and glycol after scrubber, fuel gas skid package, regen skid with b-tex and tank farm with containment.

​​ 

Reagan Terminal

Texas

July 2014 - August 2015

​The Reagan Terminal is a two phase transmission and storage station for downstream hook up of crude oil pipeline consisting of the installation of multiple lact skids, header rack with helical pier supports, piping, and storage tanks. This station acts as one of the primary facilities in the Medallion Wolfcamp Connector Crude Oil Gathering System. 

FEATURED PROJECTS

Est. 1953

Corral Canyon Compressor Station 

New Mexico

October 2016 - December 2016

The Corral Compressor Station is a grassroots project consisting of the construction and installation of two compressor packages, header rack with piping, horizontal slug catcher,inlet filter, vent stack, discharge filter, fuel gas skid package, regen skid with B-tex and tank farm with containment. Site grading and installation of gravel was also performed. In late 2017, Bowden was also awarded the installation of a third compressor package at the station.


Desperado Compressor Station 

Texas

June 2017 - August 2017

The Desperado Compressor Station is a grassroots project consisting of the construction and installation of three compressor packages, header rack with piping, horizontal slug catcher, inlet filter, two-phase separator, vent stack, three-phase separator, discharge filter, glycol contactor with exchanger and glycol after scrubber, fuel gas skid package, regen skid and tank farm with containment. Site grading and installation of gravel was also performed.


Alamo Compressor Station

New Mexico

Spring 2019 

Grassroots, four compressor station with header rack, slug catcher, inlet filter, fuel gas scrubber, regen skid, B-Tex and tank farm.

Black Creek Compressor Station

Texas

October 2013 - January 2014

​This grass roots project included the installation of inlet liquid handling facilities and five compressor skids. The project included foundation installation, structural steel racks, piping fabrication installation, testing and painting. 

Karbach Compressor Station - Phase II

Oklahoma

February 2017 - August 2017  

​The Karbach Phase II is a three compressor expansion project including the addition of a 300-foot header rack, slug catcher, inlet filter, fuel gas scrubber, and regen skid at the existing Karbach Compressor Station.   

Little Bear 

New Mexico

Spring 2019 

Project consisted of the simultaneous construction at three separate pad sites of individual 2 to 3 train production facilities with vertical separators, horizontal separators, vertical heater treaters, flare scrubber, flare , VRT, and tank battery.  

Rogue Compressor Station

​Oklahoma

September 2016 - January 2017

​The Rogue Compressor Station is a grass-roots project consisting of initial site grading and soil stabilization, along with installation for three compressors (with catbox pads), slug catcher, inlet filter, fuel gas scrubber, regen skid with B-Tex and tank farm with containment.

Careers.

BTA Compressor Station

Texas

September 2017 - November 2017

​The BTA Compressor Station is a 400' x 400' grassroots site including the installation of two compressor skids, header rack, inlet separator, fuel gas skid, filter separator, glycol contactor, tank farm, and vent stack.

Company

Resources.

 Midstream Oil and Gas Contractor